We propose joint projects
Monday, 31 January 2011 16:19

 

We search partners for realization of the next projects (by means of establishing of a joint venture):

1.     Oil project in the Utah State, USA (we have more detailed presentation)

a.     By means of "GeoNMR" method we obtained information about location of the oil field.

b.     This project has next estimation of financing:

                                                             i.      Land lease~ 500 000$

                                                           ii.      Additional geophysical surveys~ 300 000$

                                                        iii.      Drillingfrom 3 000 000 to 6 000 000 $

c.      Our tentative estimation of the deposit volume - not less than 10 millions barrels of oil.

d.     Terms of realization of the project

                                                             i.      Obtaining  of the land will take 6-8 months

                                                           ii.      Additional surveys will take 2-3 months

                                                        iii.      Drilling will take from 3 till 6 months

2.     Oil project in the Mongolia

a.     By means of "GeoNMR" method we obtained information about location of the oil field.

b.     This project has next estimation of financing:

                                                             i.      Land lease ~ 1 000 000$

                                                           ii.      Additional geophysical surveys ~ 600 000$

                                                        iii.      Drilling about 5 boreholes – 15 000 000$ to 30 000 000$

c.      Our tentative estimation of a of the deposit volume - 100 millions barrels of oil.

d.     Terms of realization of the project

                                                             i.      Obtaining  of the land will take 6-12 months

                                                           ii.      Additional surveys will take 2-3 months

                                                        iii.      Drilling will take from 6 till 18 months

 

 

 

For additional information contact, please, Vladyslav Kholodov, Director of Genesis Corporation